Consorcio Olímpico · Stadiums and sports infrastructure
Technical documentation package developed with BIM methodology

100%
of the package generated from the model
0
CAD drawings before the model
Challenge
The project required producing the technical documentation package directly from BIM models, ensuring coordination between disciplines, drawing accuracy and fewer reworks during the design stage.
Solution
FRATA INGENIEROS assembled a dedicated remote team focused exclusively on the project's BIM development. The team worked side by side with the design specialists, turning their sketches, technical criteria and early schematics into discipline BIM models and documentation ready for the package. This flow skipped the traditional CAD-first process, cutting time, duplicated work and incompatibility risks.
Result
The technical package was delivered under BIM methodology, with cleaner, coordinated and traceable documentation. The final deliverable was reconciled across disciplines, reducing design clashes and strengthening the project's technical quality.